Home from Mallory on Thursday night, unloaded the bikes, ate and started finishing work on the Triumph again... I only lasted till midnight. I was cream-crackered. I had to get both bikes pretty much ready to roll down Bray Hill by Sunday night as I was travelling for work early on Monday until the night before our ferry to the Isle of Man in 10 days time.
Those lovely WalterMoto rear-sets don't have an exhaust hangar on them... maybe I got the wrong ones. Not much I could do about it than make my own exhaust hangar...
A bit rough... but strong... up for the job and done.
Can't even see it hidden behind the rear-set...
Replaced those horrible after-market brake reservoirs with standard items on a 'TT' mounting
Using nature's spray booth. A challenge in the bright sunlight, a breeze... loads of dust and insects sticking to the wet paint. We like a challenge.
My drying cabinet...
Beautifully simple - a kit race loom, lithium battery and Bazzaz fuelling module strapped in with care and attention to detail by JT.
I wired in the rain rain light and switch...
I kept going on the other stuff till 1 in the morning. A few hours sleep then back on the job early on Sunday. At Halfords as they open the doors for more lacquer... then back to finishing it all off. By 16h00 I still had a list of things to do, but these could be managed on the Isle.
I got cracking on prepping the wee bike - the KMR. Check, prep, oil change and some clutch steels for adjustment (I felt some clutch slip on track). Still stuff to do (like new tyres and sponsor decals), but things that we can do in about 2 hours on the Isle.
Dinner, pack the spares, pack the tool box, make lists, lots of lists. By midnight my head hits the pillow for a few hours kip before being up at 04h00 to travel for work. A serious lack of sleep... my hands, arms and back aching from the work that I'm not accustomed to. All goot conditioning for the TT. I can catch up on the sleep over the next week.
More precision detail - this time on the KMR. A custom clutch setup by Ryan Farquhar carrying additional plates to handle the extra power of the wee 650 twin. About 30% more than standard. Check out that beautiful billet clutch basket.. a billet engine cover spacer too. Proper!
I love lists.
It's been a big push, but the bikes are pretty much there... just a few hours more on each when were on the Isle and we're ready to rock 'n roll. Bring on some rest and sleep over the next 9 days...
Starting to look good :-)